Your next BeNeLux site could be built, paid for, and still sit dark.

30 views

Grid operators in Belgium and the Netherlands are rewriting the rules.
Fluvius now connects most new Flemish sites on flexible terms. This winter, the six Dutch regional DSOs start capping capacity for public charging.


On 3 November, @Robert Brehm, our co-founder & CTO, walks through:
→ what Fluvius and the Dutch regional DSOs require from charging sites, and on what timeline

→  how real-time IEC control and day-ahead OpenADR limits work together, and why the strictest limit always wins

→  what the technical setup involves, from DSO signals and measurements to the acceptance test at commissioning

What this means for your rollout:

→ You can sign a flexible connection or new grid contract knowing what's required and what happens to your site when capacity is limited.

→ Where a battery is on site, it absorbs the reduction first and helps protect charging availability.

→ The same setup works across Belgium and the Netherlands, and the flexibility you commit can become an extra revenue stream.


2027 is closer than your next grid application.
Save your seat for Tuesday 3 November, 11:00 CET